Below you will see the next stage in the construction of the engineering building we are currently working on.


All the cables have been delivered and we are currently busy installing them. There are thin cables and then thare are some major ones waiting for use to be dragged into place thru-out the engineering workshop. The really thick cables will be left for last, as they are the main incoming power cables.


 



Today we have dragged into place 500 meters of 16mm² cable and installed five 80A welding plugs, 450 meters of 2.5mm²  cable with seven  ordinary 220V plugs.


Many more cable dragging and installation awaits us next week. I will keep you posted as we proceed.