Below you will see the next stage in the construction of the engineering building we are currently working on.

 

Now that the floor has been done and finished, we were allowed to start installing the workshop bay lights. This must have been the most uncomfortable and scary work I've done in a long time... check this out!   Nearly 40 feet of pure death waiting for me at the bottom...

 



It took us exactly 5 days to wire and install 60 high-bay lights into the two workshop bays, but we finally finished and all the lights were switched on to make sure it all worked.



I will keep you posted as we proceed to install the main cable and switching gear for the electrical distribution.

 